Engineering insight often arrives too late to shape the bid, optimise the plan or support decisions offshore. The result is conservative assumptions, repeated engineering work and valuable vessel time left unused.
Analyse.Go carries one qualified engineering basis from bid to offshore execution.
Explore vessels, methods, schedules and operating limits before committing. Develop and approve the plan efficiently, then quickly re-run when the vessel, sequence, design basis or weather changes.
Make every decisionwork offshore.
Recover vessel time
Limits set below the operation's true capability can make workable weather conditions appear unavailable. Test alternative vessels and operating limits to identify where workable time can be recovered and offshore schedules improved.
Reduce engineering latency
Bring planning, analysis and reporting into one repeatable workflow. Reduce the handovers and queues between engineering questions and documented answers, so your team can test more alternatives and support more tenders and live projects.
Adapt within the operational timeframe
A substituted vessel, revised design basis, schedule shift or updated forecast no longer needs to trigger a new engineering round. Rerun the qualified analysis with the same engineering basis and checks used for approval.
Understand the impact of scope changes
See what has changed between tender and project execution, and assess the impact on engineering requirements, workability and the vessel schedule. Give project and commercial teams a clearer basis for managing variations.
Test more. Analyse faster.Adapt sooner.
Automated, physics-based workflows allow teams to assess more options quickly while applying consistent checks, technical standards and risk criteria. Get faster answers while maintaining the quality and rigour of the engineering behind them.

Test more alternatives
Compare vessels, methods and schedules through one consistent workflow. Explore more options and identify the strongest delivery strategy.

Build a transparent delivery case
Show clients and senior management how each option affects workability, vessel time, cost and delivery risk. Create a clear engineering basis for decisions and internal approval.

Focus engineering where it delivers most value
Connect engineering limits with site-specific metocean data to identify where time is being lost across the operation. See which activities and operating limits have the greatest impact on waiting on weather, so you can focus engineering resources where further analysis and optimisation could recover the most vessel time.

Keep MWS approval moving
Produce high-quality analysis quickly using consistent, QA-assured methods. Traceable documentation gives the MWS a clear basis for review and makes comments faster to close — better evidence at decision time, not a lighter check.

Act on workable weather windows
Use response forecasting to bring approved operating limits together with latest forecast, vessel capabilities, installation aids and project schedule. Update the assessment as conditions change to identify workable opportunities and support timely offshore decisions.
Shorten the path from question to answer.
Analyse.Go reduces engineering latency across the complete workflow, from setting up and running the analysis to reviewing results, updating assumptions and producing documentation for approval.
Faster engineering turnaround
Move quicker from an engineering question to a qualified, documented answer that is ready for review.
More engineering capacity
Reduce repetitive setup, analysis and reporting, giving specialist teams more capacity to support tenders and live projects.
Better use of vessel time
Identify where operating limits and engineering assumptions are reducing workability, and where further optimisation could recover valuable vessel time.
Multiple vesseldays saved.
30%
less time spent
on planning and analysis.Hours
not weeks from engineering question to usable answer.